Office and warehouse center

New construction. A modern complex combining administrative and warehouse facilities, equipped with everything necessary for efficient work and storage of goods.

Mukachevo, 2021-2022
Total building area – 1,400 m2

THE FOLLOWING WORKS HAVE BEEN PERFORMED:

A full range of construction preparation and implementation works. 

Foundations – monolithic tape.

Wall materials – ceramic brick.

Wall insulation – mineral wool-100mm.

Window structures – metal-plastic and aluminum.

Overlapping – metal prefabricated.

Roofing – sandwich panels on metal trusses, flat roof membrane.

Exterior decoration – sandwich panels t=100mm and foam t=100mm, with a decorative fur coat.

Heating – underfloor heating system based on heat pumps.

Ventilation – supply and exhaust with heat recovery in the office area.

Electrical and low-voltage networks – installation of the entire power supply network, video surveillance, Internet, and fire alarm.

Floor coverings – concrete, reinforced and not covered with topping.

Interior decoration – without decoration.

Design team:

Architects – Bihan Architects, Olivia and Mykhailo Bigany

General design – Private entrepreneur Rizak Vasyl Vasilyovych