Catholic hostel

Reconstruction of a private house into a dormitory for students, which combines comfortable living with opportunities for learning and spiritual development.

Beregovo, 2018 – 2019

Total area – 1360 m2

THE FOLLOWING WORKS HAVE BEEN PERFORMED:

A full range of construction preparation and implementation works. 

Foundations – prefabricated-monolithic.

Wall materials – aerated concrete blocks.

Wall insulation – mineral wool, t=100mm

Window structures – wooden.

Overlapping – monolithic.

Roofing – combined (seam, ceramic tiles).

Roof structures – metal and wooden supporting structures.

Exterior decoration – decoration with ceramic tiles and decorative plaster of the “fur coat” type.

Heating – VRF system and hot water supply using heat pumps

Ventilation – supply and exhaust with heat recovery in the assembly hall.

Electrical and low-voltage networks – installation of the entire power supply network, video surveillance, Internet, fire alarm, and access system.

Interior decoration – finishing of walls, plastering, puttying and painting, finishing of walls and floors with ceramics and linoleum, carpeting

Design team:

Architect – Petro Sarvash

General design – Ankon Project Group, GIP – Roman Antonov.

Video