Reconstruction of the store building with an extension. During the reconstruction of the store, the area of the retail space was increased and the interior was updated.
Beregovo, 2019-2020.
Total area – 420 m2
A full range of construction preparation and implementation works.
Foundations – monolithic tape
Wall materials - aerated concrete t=400 mm
Wall insulation – foam plastic t=50-100mm
Window structures – metal-plastic 5-chamber
Overlapping – prefabricated concrete slabs
Roofing – metal profile for wooden structures
Exterior decoration – pebble plaster of the “Shuba” type
Interior decoration – puttying and painting walls, ceramic floor decoration
Heating – underfloor heating system with gas boiler
Electrical networks – updating the entire power supply network, installing a fire alarm system
General design – FOP Borno Mykola Mykolayovych